Crewe Lane, Southwell
November 2002 to January 2003
The works involved the demolition and remediation of a former workshop
and yard. The site was heavily contaminated with hydrocarbons and heavy
metals. Following the demolition, deep buried underground fuel and tar
tanks were encountered. These were located below the water table and
made remediation difficult. These tanks were successfully removed and
the site area remediated to residential standards.

|